Huawei UPS5000-S Series User Manual page 87

Ip42, 40 kva power modules
Hide thumbs Also See for UPS5000-S Series:
Table of Contents

Advertisement

UPS5000-S-(40 kVA-200 kVA)
User Manual (IP42, 40 kVA Power Modules)
No.
05
06
07
08
09
10
1. In the scenarios where holes are drilled for routing cables or covers are removed for routing cables,
2. After verifying the installation, reinstall all the covers.
3. Do not remove the dustproof cover before power-on to prevent dust inside the UPS.
Issue 03 (2020-01-10)
Item
Cable ties
Cable connections
Grounding
AC phase sequence
Battery cable connections
Foreign matter cleaning inside
the cabinet
after routing cables and checking cable connections, use sealing putty to fill in the gap between the
cables and the cabinet.
Copyright © Huawei Technologies Co., Ltd.
Acceptance Criteria
concise and easy to understand.
Cable ties are secured evenly and no burr
exists.
The input, output, and battery cables are
securely connected. For the cables secured by
screws, the spring washers are flattened.
The resistance between the UPS ground bar
and the equipment room ground bar is less than
0.1 ohm.
For a single UPS, the mains input, bypass
input, and output phase sequences are correct.
For a parallel system, the phase sequences of
each UPS must be consistent.
The battery strings are correctly connected to
the UPS.
The inside and outside of the cabinet, and other
operating components, are free from
conductive dust.
1. There is no foreign matter (such as copper
wires and screws) on the top of the cabinet.
2. There is no foreign matter on the copper
bar terminals.
3. There is no foreign matter around switch
terminals.
4. There is no foreign matter on the bottom
plate of the cabinet.
5. There is no foreign matter on the rear
module subrack.
3 Installation