Install The Foot Switch; Install The Node Harness - Raven SmarTrax Installation Manual

Apache asxx20 series model year 2012
Hide thumbs Also See for SmarTrax:
Table of Contents

Advertisement

Install the Foot Switch

Foot Switch Installed
FIGURE 4.
Select a suitable location for the foot switch (P/N 063-0172-470) to be installed.
1.
Note:
The foot switch should be installed in a location where the operator has easy access to it and is
able to fully press the pedal.
Using the holes in the foot switch as a template, drill holes in the floor of the cab.
2.
Secure the foot switch to the floor by installing the supplied screws in each of the mounting holes.
3.

Install the Node Harness

SmarTrax Node Installed
FIGURE 5.
Install the two large, rectangular connectors of the node harness into the correct ports of the SmarTrax
1.
node.
Tighten the bolts on the node connectors to secure the connections.
2.
Locate the ENABLE connector and connect it to the foot switch cable connector.
3.
Connect the DGPS connector to the receiver or other GPS source.
4.
Manual No. 016-4001-115 Rev. B
Cab Component Installation
19

Advertisement

Table of Contents
loading

Table of Contents