Verifying Installation Of The Sidekick Pro™ Icd - Raven SideKick Pro Installation & Operation Manual

Icd 1-40 oz./min. and 5-200 oz./min.
Table of Contents

Advertisement

CHAPTER 4
VERIFYING INSTALLATION OF THE SIDEKICK PRO™ ICD
Perform the following procedure to verify that the system is installed properly:
1. Fill the chemical supply tank with clean water.
2. Verify all calibration settings are set for each injection node on the system. Refer to Chapter 5, Calibration and
Operation.
3. Prime and calibrate the pump. Refer to Chapter 5, Calibration and Operation.
4. Set a target rate for the chemical injection and run the pump in Auto application mode.
5. Check for any leaks at each plumbing connection before applying chemicals with the injection system. It is also
recommended to check the system periodically and replace worn or damaged connections, valves, or hoses.
30
SideKick Pro™ ICD 1-40 oz./min. and 5-200 oz./min. Installation & Operation Manual
NOTICE
Plastic or metal particles may be left in the tank
from the manufacturing or installation process.
These particles may cause a significant reduction
in pump performance if they get stuck within the
injection pump.
Prior to filling the chemical tank or testing the
injection system, thoroughly vacuum the
chemical supply tank. Turn the hand valve(s) to
allow the tank to drain without running through
the pump or injection plumbing and thoroughly
rinse tank.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SideKick Pro and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents