Dealer Set Up Instructions - Woods BATWING BW20.50QE Operator's Manual

Rotary cutter
Hide thumbs Also See for BATWING BW20.50QE:
Table of Contents

Advertisement

Available languages

Available languages

DEALER SET-UP INSTRUCTIONS
Assembly of this cutter is the responsibility of the WOODS dealer. It should be
delivered to the owner completely assembled, lubricated and adjusted for nor-
mal cutting conditions.
The cutter is shipped partially assembled. Assembly will be easier if compo-
nents are aligned and loosely assembled before tightening hardware. Recom-
mended torque values for hardware are located on page 76.
Select a suitable working area. A smooth hard surface, such as concrete, will
make assembly much quicker. Open parts boxes and lay out parts and hard-
ware to make location easy. Refer to illustrations, accompanying text, parts lists
and exploded view drawings.
Complete the check list on page 30 when assembly is complete and cutter is
delivered to the customer.
WARNING
WARNING
Before working underneath, carefully read Operator's Manual
instructions, disconnect driveline, raise mower, securely block up all cor-
ners with jackstands, and check stability. Secure blocking prevents
equipment from dropping due to hydraulic leak down, hydraulic system
failures, or mechanical component failures.
Do not disconnect hydraulic lines until machine is securely blocked
or placed in lowest position and system pressure is released by operat-
ing valve levers.
Always wear relatively tight and belted clothing to avoid entangle-
ment in moving parts. Wear sturdy, rough-soled work shoes and protec-
tive equipment for eyes, hair, hands, hearing, and head; and respirator or
filter mask where appropriate.
Install Wheel
Figure 24. Center Section Wheel and
Hub Installation
MAN1279 (15/04/2019)
ASSEMBLY INSTRUCTIONS
1. Center Wheel Yoke Arm
83. 1/2" NC x 3" HHCS GR5
88. 1/2" NC Flange Lock Nut
Winch Kit Installation
Figure 25. Roller Assembly Installation
1. Locate and drill one 14.28 mm (9/16 in.) hole in each wing using
dimensions shown in Figure 25. Assemble items 1, 2, 3 and 4. Use
assembly to locate and drill remaining holes.
2. Secure idler brackets (1) and rollers (2) to deck with bolts (5) and nuts
(6).
3. Remove cylinder pin: Place channel (10) over cylinder and cylinder lug.
Place wing lock-up bracket over channel and insert pin (8), washers (7),
and cotter pins (9). NOTE: Washers (7) are used as spacers and are
placed between lock-up bracket and channel (10) as needed.
4. Repeat step to install second channel (10) on opposite wing.
5. Attach winch assembly to channels (10) using bolts (5) and lock nuts (6).
6. Move SMV sign and hardware to channel as shown in the winch kit
instructions.
7. Tighten all hardware. See Parts page 77 for complete diagram and part
list.
Figure 26. Winch Channel Installation
Dealer Service 27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Batwing bw20.60qeBatwing bw20.70qe

Table of Contents