Installation and assembly
20
Fig. 6: H system
12.
Glue an H system (pipework) to the outside air outlet to pre‐
vent dirt or rain water from penetrating inside (e.g. may be
assembled using 3 T-pieces).
CAUTION!
Do not position the air outlet in the
vicinity of:
Take into account the wind dynamic
pressure, e.g. at the side of a building
Use a Ø160 mm pipe if lines are too long
or there are more than 3 bends
Contact van der Heuvel Watertechnologie bv.
should you have further questions.
13.
Non-return valve
Install a non-return valve in the potable water
supply line in compliance with national regu‐
lations.
Connect a potable water line with the system's Ø 20 mm
PVCU "water supply" connector. The connector should be
combined with a stopcock.
Maximum pressure = 6 bar
n
Minimum flow = 8 l/min
n
Temperature = Potable water, 15 ... 25 °C
n
Minimum pressure downstream of the non-return valve =
n
2 bar
14.
For the "external product storage tank": Connect the PVCU
connector Ø 32 (C) "Product outlet" and the connector on the
external product storage tank (J).
15.
Connect a reinforced PVC hose Ø 6x12 mm between the "Fill
brine storage tank" connector (B) and the connector Ø 6x12
mm on the brine storage tank (K).
16.
Connect a reinforced 9x12 mm PE hose between the brine
storage tank (K) and the "Brine inlet" connector (D).
19.
Electrical connectors - as per the electrical circuit diagram:
Connect the external alarm contact to the control cabinet -
via the housing section (H).
H
2
Suction openings
Windows
Chimney openings
B1016