ProMinent CHLORINSITU IIa Assembly And Operating Instructions Manual page 12

Chlorine electrolysis system
Hide thumbs Also See for CHLORINSITU IIa:
Table of Contents

Advertisement

Components of the system
#
Connectors, to be installed on site.
A
Connectors, softened water (potable
water quality).
A suitable non-return valve is needed for the water connector.
B
Connector for water from the softener
into the brine storage tank.
C
Connector for product from the product
metering pump to the external storage
tank.
D
Connector for brine from the brine
storage tank to the brine metering
pump.
E
Exhaust air line for diluted hydrogen
F
Overflow of the brine storage tank
G
Power supply 3x400 V AC, N, PE, 50
Hz
H1 LL, L, H, H, HH signals for external
product storage tanks
H2 LL tank empty signal (metering stop)
H3 External activation
H4 Alarm contact
H5 Softening output 17 VDC and control
I
Ethernet cable
J
Optional: external product storage tank
K
Brine storage tank
R
Control cabinet
M
Production cabinet
N
Optional: Softener frame
12
Installation
External pipework
side
DN15/Ø20
Ø20 mm, PN16, PVCU,
mm
PVCU
6/12 mm
Connector from the
hose
brine storage tank to
the system cabinet
DN15/Ø20
Ø20 mm, PN16, PVCU,
mm
PVCU
PE hose,
PE hose, transparent
transparent
9x12 mm
9x12 mm
Ø125 mm
Max. 10 metres and 3 knee/bends.
At the outlet point: rain and wind protection.
Ø125 mm, PVCU pipework, continuously
rising (>1%) and leading outside
Ø32 mm, PN16, PVCU, PVCU
One of the following ports must be open: UDP1193, TCP
443, TCP 80. For more information:
http://www.remoteengineer.eu/en
Dimensions:
at 625 g/h: 200 l
at 1250 g/h: 380 l
at 2500 g/h: 520 l
Includes internal power supply, control,
etc.
Includes cells.
Also includes the degasser.
Specification
2 ... 5 bar (g); > 10
l/min.
Max. 0.05 °dH;
15 ... 25 °C
10 m not included
in the scope of
delivery