Procedure
Step 1 Install the UPSs in a parallel system using the single UPS installation methods. For details,
see
Step 2 Unscrew the connecting kit and put it through the reserved holes to connect the two UPSs and
then tighten the screws on the kit, as shown in
Figure 3-50 Connecting parallel plates
----End
3.3.2 Connecting Power Cables
Procedure
Step 1 Ground each UPS in a parallel system separately, and connect power cables and battery
cables.
Step 2 Based on the site configurations, select a parallel connection method to connect cables for the
parallel system.
and
Issue 07 (2019-12-13)
3.2 Installing a Single
You also need to connect parallel plates at the rear of the UPS.
Figure 3-51
Figure 3-52
shows the cable connections for this system.
Copyright © Huawei Technologies Co., Ltd.
UPS.
Figure
shows a typical conceptual diagram for a 1+1 parallel system,
3-50.
3 Installation
82

Advertisement

loading

This manual is also suitable for:

Ups5000-e-75k-bf