UPS5000-E-(25 kVA-75 kVA)-BF
User Manual
Figure 3-67 Positions to be checked for foreign matter
(1) Switches
Issue 07 (2019-12-13)
1. In the scenarios where holes are drilled or covers are removed for routing cables, use sealing putty to
fill in the gap between the cables and the cabinet after routing cables and checking cable
connections.
2. After verifying the installation, reinstall all the covers.
3. Do not remove the dustproof cover before power-on to prevent dust inside the UPS, as shown in
Figure
3-70.
(2) Wiring terminal block
Copyright © Huawei Technologies Co., Ltd.
3 Installation
(3) Cabinet bottom