Preparing Power Cables; Unpacking And Checking - Huawei SmartLi-80Ah User Manual

Table of Contents

Advertisement

SmartLi-80Ah
User Manual
Tools and Meters

3.1.3 Preparing Power Cables

Table 3-2 Recommended cross-sectional areas for power cables
Item
Battery

3.1.4 Unpacking and Checking

Context
Issue 02 (2020-05-17)
Table 3-1 lists only the common tools for installation and cable connection. For more dedicated tools
required, see the corresponding component manuals. Prepare tools based on site requirements.
Recommended
cross-sectional
2
area (mm
)
When selecting, connecting, and routing power cables, follow local safety regulations
and rules.
When the external conditions change, for example, the cable layout or ambient
temperatures, perform verification in accordance with the IEC-60364-5-52 or the local
regulations.
Cable type: single-core 90° C soft power cable with a copper conductor.
Copyright © Huawei Technologies Co., Ltd.
Description
+
120 (The load of a single battery cabinet is less
than or equal to 150 kW, you are advised to set
N
the I1 value of the battery circuit breaker to the
MIN value.)
-
150 (The load of a single battery cabinet is
greater than 150 kW.)
PE
70
3 Installation
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartli series

Table of Contents