Huawei SmartLi Series Quick Manual

Huawei SmartLi Series Quick Manual

Hide thumbs Also See for SmartLi Series:

Advertisement

SmartLi Quick Guide
Issue: 05
Part Number: 31500BED
Date: 2019-10-15
1
Overview
Model
SmartLi-512V-80AH-F
SmartLi-512V-80AH-S
Front View
Battery circuit breaker
Monitoring module
Battery management module
End pressure gauge
Battery module
NOTE
The auxiliary wrench is used to assist in turning on and off the battery switch.
Capacity
Weight
< 750
80 Ah
kg
Fuse
Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved.
Dimensions (H x W x D)
2000 mm x 600 mm x 850
mm
Rear
View
MDU
Auxiliary
wrench
Fire-trace
cylinder
Fuse
1
Configuration type
With an LCD
Without an LCD
tube
Fire

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SmartLi Series

  • Page 1 SmartLi Quick Guide Issue: 05 Part Number: 31500BED Date: 2019-10-15 Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved. Overview Dimensions (H x W x D) Configuration type Model Capacity Weight SmartLi-512V-80AH-F With an LCD < 750 2000 mm x 600 mm x 850...
  • Page 2 2. Use insulated tools during installation and operation. 3. Only Huawei engineers or engineers certified by Huawei are allowed to install, commission, and maintain the battery cabinet. Otherwise, personal injury or equipment damage may occur, and the resulting battery cabinet faults are beyond the warranty scope of Huawei.
  • Page 3 b. Clamp the end of the fire-trace tube to the threaded nozzle using a pipe holder. Hold the pipe holder close to the end to avoid bending the tube during pipe insertion. c. Tighten the nut to a torque of 7 N· m. 7.
  • Page 4: Installing A Cabinet

    Installing a Cabinet Secured Installation 1. Determine the position for installing the cabinet. 5. Open the front door, and remove the four Mark mounting holes based on the drawings rubber plugs from the bottom of the (unit: mm). cabinet. 6. Insert four M12x115 expansion bolts into the expansion bolt holes in the floor, and tighten the expansion bolts.
  • Page 5 Cable Connection Reference Cable Connection Reference • Prepare cables away from the cabinets to prevent scraps from falling inside. Cable scraps may ignite and cause personal injury or device damage. • After cables have been installed, clean the cabinets in a timely manner. Keep the cabinets and surrounding environment clean and tidy.
  • Page 6 3. Connect the ground cable. NOTE The 70 mm ground cable is recom mended. Installing Battery Modules and Cables 1. Pull out the battery management module for 2. Install battery modules. about 10 cm 1. Install the battery modules from bottom to top and from left to right to prevent falling over due to imbalance.
  • Page 7 3. Remove front cover from the battery module, 4. Install battery communications cables. and install battery baffle plate. 1. Communications cables between the battery modules and the battery management module are preinstalled inside the cabinet. 2. Connect cables between the battery modules and then connect the cables to the battery management module.
  • Page 8 5. Open the battery terminal protective cover, install battery copper bars and cables. 1. During installation, wear insulation gloves and use insulated tools. 2. Battery cables are preinstalled inside the cabinet. 3. Install copper bars between the battery modules, and then install cables between the battery modules and the battery management module.
  • Page 9: Installing Output Cables

    Installing Output Cables 1. Install power cables. 2. Install a control cable to the UPS. Combining Cabinets 1. The SmartLi supports the combination of up to five cabinets. 2. When multiple cabinets are connected in parallel, only the basic cabinet has an LCD. 3.
  • Page 10 4. Connect battery cables. 5. Connect control cables. MUE05A The numbers of cabinets in a parallel system depend on the connection of control cables. After the control cables are connected according to the preceding figure, the cabinets are numbered 1, 2, 3, 4, and 5 from top to bottom.
  • Page 11: Verifying The Installation

    Verifying the Installation 1. Check that there is no foreign matter at the top and bottom of the cabinets, copper bars, switches, and the rear of units. 2. Check that the battery cables are correctly connected. 3. After verifying the installation, reinstall all the covers. 4.
  • Page 12 Powering On 1. On the UPS LCD screen, set System Info > Settings > Battery Settings > Battery Type to Lithium battery. • Upgrade the UPS software to the version that supports lithium battery connection. See UPS5000 The Relationship of Software Version to check the version number. •...
  • Page 13: Powering Off

    4. After the green indicator of the battery management module blinks at 10 Hz, turn on the battery circuit breaker on the SmartLi. 5. When multiple SmartLi cabinets are combined: 1) If the green indicator of one battery management module blinks at 10 Hz, turn on the battery circuit breaker on any SmartLi.
  • Page 14 Scan here for technical support (carrier): Huawei App Store Scan here for more documents: Support-E Support WeChat You can also log in to Huawei technical support website: http://support.huawei.com/enterprise http://support.huawei.com Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China...

This manual is also suitable for:

Smartli-512v-80ah-fSmartli-512v-80ah-s

Table of Contents