Huawei SmartLi-80Ah User Manual page 40

Table of Contents

Advertisement

SmartLi-80Ah
User Manual
2.
Step 8 Remove the valve positioning kit, open the valve, reinstall the positioning kit, and secure it.
Slowly open the valve. To avoid unexpected blowout, do not quickly open the valve.
Figure 3-5 Opening the valve
Issue 02 (2020-05-17)
Figure 3-4 Install a fire-trace tube
Tighten the connection nut to 7 N· m using an adjustable torque wrench.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartli series

Table of Contents