SmartLi-80Ah
User Manual
Figure 3-21 Installing battery communications cables
(1) Full-capacity cabinet configuration
Step 5 Install battery copper bars and cables.
1.
2.
3.
Issue 02 (2020-05-17)
Open the terminal protective covers, install copper bars between battery modules, and
close the terminal protective covers.
Open the terminal protective covers, install copper bars between battery modules and
fuses, and close the terminal protective covers.
Open the terminal protective covers, install the battery cables reserved in the cabinet, and
close the terminal protective covers.
Copyright © Huawei Technologies Co., Ltd.
(2) Half-capacity cabinet configuration
3 Installation
45