Vertical/Tower Installation - CyberPower OL6KRT Installation And Operation Manual

Smart app online ups system
Hide thumbs Also See for OL6KRT:
Table of Contents

Advertisement

HARDWARE INSTALLATION CONT.

VERTICAL/TOWER INSTALLATION

Step 1: Adhere rubber pads
Adhere the protective rubber pads to the left hand side of the UPS power module and extended battery
module.
1
Step 2: Attach the base stands and attach the dust covers
Stand the UPS power module and extended battery module on its side. Secure the tie bracket on top of the
power module and extended battery module with four black M5X7L flat head screws. Insert dust covers
into the screw holes that are not being used. Optionally, use the rack mount ears as tower stands. Screw
them onto the power module and extended battery module with four black M5X6L pan head screws for
adding stability.
2
Step 3: Rotate the Multifunction LCD Control Panel
Unscrew the upper panel of the UPS. Separate the upper panel from the UPS. Gently lift the LCD control
panel out. Rotate it to the tower orientation. Reinstall it for a tower configuration.
3
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ol8krtOl10krt

Table of Contents