Rack System Instructions
The following or similar rack-mount instructions are included with the installation instructions:
•
Elevated Operating Ambient - If installed in a closed or multi-unit rack assembly, the
operating temperature of the rack environment may be greater than the ambient room
temperature. Therefore, consideration should be given to installing the equipment in an
environment compatible with the environmental specifications listed in this document.
•
Reduced Air Flow - Installation of the equipment in a rack should be placed such that the
amount of air flow required for safe operation of the equipment is not compromised.
•
Circuit Overloading - Consideration should be given to the connection of the equipment
to the supply circuit and the effect that overloading of the circuits might have on
overcurrent protection and supply wiring. Appropriate consideration of equipment
nameplate ratings should be used when addressing this concern.
•
Reliable Earthing - Reliable earthing of rack-mounted equipment should be maintained.
Particular attention should be given to supply connections other than direct connections to
the branch circuit (for example, use of power strips).
Pre installation
Note:
The Acme Packet 1100 shall only be installed in a restricted access location.
The Acme Packet 1100 must have access to reliable power and cooling. When choosing
a location for your Acme Packet 1100, follow the guidelines listed in this section.
Environmental Guidelines
When preparing to install your Acme Packet 1100:
•
Locate the Acme Packet 1100 in a clean and well-ventilated room. This location should
also be far from areas where heat, electrical noise, and electromagnetic fields are present.
Power Guidelines
When preparing to install your Acme Packet 1100:
•
Ensure that the installation location has access to adequate power and grounding. Separate
circuits should be available for each of the two Acme Packet 1100 power supplies.
•
Never use extension cords when powering an Acme Packet 1100.
•
Use grounded, 3-conductor circuits.
•
A local earth ground must be available.
•
A service disconnect must be provided for each power supply that is clearly marked and is
nearby the equipment.
Chapter 3
Pre installation
3-2