CyberPower PDU33 Series User Manual page 43

3-phase intelligent pdu
Table of Contents

Advertisement

Scheduled Outlet On/Off/Reboot
Outlet(s) can be set to automatically turn on, turn off, or reboot at scheduled times. See
Outlet Action >
Schedule. (For Switched Metered by Outlet Series and Switched Series only.)
Select the role of PDU (HOST or GUEST#) first if PDUs are daisy chained. Up to 3 GUEST PDUs
can connect to 1 HOST PDU. Select the Once, Daily or Weekly option, and then click the Next
button to enter the
Add New Action Schedule Page.
Item
Frequency
Once
Daily
Weekly
3-Phase Intelligent PDU User Guide
PDU Tab > Outlet Action > Schedule
Scheduled action takes place once at the configured date and
time.
Scheduled action takes place daily at the configured time.
Scheduled action takes place once a week for the configured day
and time.
Definition
Web Interface
PDU Tab >
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdu43 seriesPdu73 seriesPdu83 series

Table of Contents