Data Center Environment Checklist - Oracle EXADATA X7-2 EF Installation Manual

Hide thumbs Also See for EXADATA X7-2 EF:
Table of Contents

Advertisement

Preparation Checklists
Data Center Room Considerations
Have you confirmed that the access route is free of any
obstacles that would expose the device to shock?
If there are stairs, then is a loading elevator accessible
for moving the equipment?
Has the rack location been allocated?
Is there a vacant space in the rack for the new server?
Does the floor layout meet the equipment maintenance
access requirements?
Have cabinet stabilization measures been implemented?
Will the hardware location require any non-standard
cable lengths?
Is the floor to ceiling height a minimum of 2914 mm or
2.9 m (9.6 feet)?
Related Information
"Rack Compatibility" on page 36

Data Center Environment Checklist

Complete the following checklist to ensure that the data center environment requirements are
met for the server.
Data Center Environment Considerations
Does the computer room air handling meet temperature
and humidity requirements?
Does the installation floor layout satisfy the ventilation
requirements?
Will the equipment be positioned so that the exhaust air
of one rack does not enter the air intake of another rack?
Are the perforated floor tiles each rated at 400 CFM or
greater?
Do the data center air conditioners provide sufficient
front to back airflow?
Is airflow adequate to prevent hot spots?
Can the data center continuously satisfy environmental
requirements?
Can more vented floor tiles be obtained if required?
82
Oracle Exadata Storage Server X7-2 EF and HC Installation Guide • November 2018
Yes
No
N/A
Comment
Yes
No
N/A
Comment

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EXADATA X7-2 EF and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Exadata x7-2 hc

Table of Contents