9.
To prepare CMA connector D for installation, remove the tape that secures the
slide-rail latching bracket to connector D and ensure that the latching bracket is
properly aligned with connector D [frames 1 and 2].
The CMA is shipped with the slide-rail latching bracket taped to connector D. Remove
Note -
the tape before you install this connector.
10.
To install CMA connector D into the left slide-rail:
a.
While holding the slide-rail latching bracket in place, insert connector D and
its associated slide-rail latching bracket into the left slide-rail until connector
D locks into place with an audible click [frames 1 and 2].
When inserting connector D into the slide-rail, the preferred and easier method is to
Note -
install connector D and the latching bracket as one assembly into the slide-rail.
Gently tug on the left side of the CMA slide bar to verify that connector D is
b.
properly seated.
Install the Cable Management Arm (Optional)
Installing the Storage Server Into a Rack
55