Install the Cable Management Arm (Optional)
a.
Align connector C with the slide-rail so that the locking spring (callout 1) is
positioned inside (storage server side) of the right slide-rail [frame 1].
Call Out
1
Insert connector C into the right slide-rail until it locks into place with an
b.
audible click [frames 2 and 3].
Gently tug on the right side of the CMA back slide bar to verify that
c.
connector C is properly seated.
54
Oracle Exadata Storage Server X7-2 EF and HC Installation Guide • November 2018
Description
Connector C locking spring