Oracle EXADATA X7-2 EF Installation Manual page 69

Hide thumbs Also See for EXADATA X7-2 EF:
Table of Contents

Advertisement

No.
1
2
Cable Port or Expansion Slot
■ Power supply 0 input power
■ Power supply 1 input power
Network management port (NET
MGT)
Back Cable Connections and Ports
Description
■ The server has two power supply
connectors, one for each power
supply.
■ Do not attach power cables to
the power supplies until you
have finished connecting the data
cables to the server. The server
goes into Standby power mode,
and the Oracle ILOM service
processor initializes when the AC
power cables are connected to the
power source. System messages
might be lost after 60 seconds if
the server is not connected to a
terminal, PC, or workstation.
Note -
Oracle ILOM will signal a
fault on any installed power supply
that is not connected to an AC power
source, since it might indicate a loss
of redundancy.
The service processor NET MGT
port is the optional connection to
the Oracle ILOM service processor.
The NET MGT port is configured
by default to use Dynamic Host
Cabling the Storage Server
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exadata x7-2 hc

Table of Contents