Procedure
Step 1 Determine the number of RH2288 servers to be installed and the installation positions based
on the monitoring device installation position diagram and cabinet configuration tables.
Step 2 Place floating nuts into the specified square holes.
Figure 9-21 Installing a floating nut
Step 3 Push the RH2288 server into the cabinet along the guide rails. Take screws out of the fitting
bag and tighten them in the holes using a Phillips screwdriver.
Figure 9-22 Installing the RH2288 server
Step 4 Find the pre-installed power cables with correct labels, and connect the cables to the power
input ports of the RH2288 server.
Issue 02 (2017-01-10)
For the monitoring device installation position diagram and cabinet configuration tables,
see the quick installation guide for the solution in use.
You can log in to the server only by using the initial configuration parameters provided in
the initial configuration parameter manual for the solution in use.