FusionModule1000A20 IT Solution
Installation Guide (2016.05, AI Version)
Figure 5-2 Installing container bases
Longitudinal and latitudinal symmetric lines are stamped on bases. When installing bases,
verify that the 400 mm edges of the bases are parallel with the length direction of
containers, and that the symmetrical lines are aligned with the reference lines.
The point where the reference lines cross is the middle point for a container base.
Step 6 Mark the hole positions for installing container bases on the concrete platform using a marker.
Figure 5-3 Determining hole positions for installing a container base
When marking hole positions for a base, ensure that the symmetric lines on the base are
aligned with the reference lines you marked.
There are eight mounting holes in a base. Mark all the hole positions.
Step 7 Move the container base away, and drill a hole in the specified position using a hammer drill,
as shown by (1) in
Issue 02 (2017-01-10)
Figure
5-4.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing a Container
17

Advertisement

Table of Contents
loading

Table of Contents