4.3 Checking Personnel Requirements

4.4 Checking the Installation Environment

Check the installation environment against items listed in
and start the installation only after all conditions are met.
Issue 02 (2017-01-10)
Construction personnel must be trained and qualified by Huawei to master methods for
system installation and commissioning, and must obtain work permits before they begin
to install and commission equipment.
Technical personnel from the customer must be trained by Huawei and master the
installation method.
The number of construction personnel depends on the project progress and installation
environment.
Construction personnel have read through the safety precautions and related product
documents before they begin work.
Common technician: familiar with the equipment installation process
Skilled technician: familiar with the equipment installation process and having an electrician
certificate
Pipeline technicians: familiar with the equipment installation process and having skills for cutting,
welding, and testing air conditioner pipes
Huawei will not be liable for any consequences caused if the installation environment does not meet
the requirements.
Mark the security zone: Use red caution belts to delimit a security zone, clean up obstacles in that
zone, and place construction signs and warning signs in eye-catching positions.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installation Preparations
2 Site Requirements
one by one,
14

Advertisement

Table of Contents
loading

Table of Contents