Trane Agility HDWA Installation, Operation And Maintenance Manual page 17

Water-cooled chillers with tracer adaptiview control
Table of Contents

Advertisement

N N o o t t e e : : The chiller should remain within its protective
shrink-wrap covering during storage.
Trane Supplied
Type of Requirement
Trane Installed
Foundation
Rigging
Disassembly/Reassembly
(as required)
Isolation
Electrical
Water piping
Pressure Relief
Insulation
"Appendix B: Agility™
Chiller Installation
Completion and Request
for Trane Service," p. 70
(HDWA-ADF001*-EN;
refer to
"Appendix A:
Forms and Check
Sheets," p.
69)
Chiller start-up
commissioning
(a)
Post-commissioning
transport of empty
refrigerant containers for
return or recycling
(a)
Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane® products. Contractor shall
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.
HDWA-SVX001D-EN
Trane Supplied
Field Installed
Trane will perform or have
direct on-site supervision
of the disassembly and
reassembly work (contact
your local Trane office for
pricing)
Circuit breakers
Unit-mounted Adaptive
Frequency™ Drive (AFD)
Harmonic filter (optional)
Autotransformer
(optional)
Relief valves
Insulation (optional)
Trane, or an agent of
Trane specifically
authorized to perform
start-up of Trane®
products
Field Supplied
Field Installed
Meet foundation requirements
Safety chains
Rigging shackles
Lifting beam
Isolation pads
Optional spring isolators, when required, are
Isolation pads
installed by others; do NOT overload springs and do
NOT install isolation springs if they block serviceable
parts such as service valves, etc.
Electrical connections to unit-mounted AFD
Wiring sizes per submittal and National Electric Code
(NEC)
Temperature sensor
Ground connection(s)
(optional outdoor air)
BAS wiring (optional)
Flow switches (may be
Inter-processor communication (IPC) wiring
field supplied)
Control voltage wiring
Tracer® AdaptiView™
display and mounting
High condenser pressure interlock wiring
arm
Chilled water pump contactor and wiring
Condenser water pump contactor and wiring
Option relays and wiring
Thermometers
Flow switches (may be
field supplied)
Water flow pressure gauges
Condenser water
Isolation and balancing valves in water piping
regulating valve
Vents and drain valves
controller (optional;
may be field-supplied)
Pressure relief valves (for waterboxes as required)
Vent line and flexible connector
Insulation
To be completed by installing contractor prior to
contacting Trane for start-up
Move empty refrigerant containers to an easily
accessible point of loading
P P r r e e - - i i n n s s t t a a l l l l a a t t i i o o n n
17