Appendix B: Agility™ ™ Chiller Installation Completion
and Request for Trane Service
I I m m p p o o r r t t a a n n t t : : A copy of this completed form must be
submitted to the Trane Service Agency that
will be responsible for the start-up of the
chiller. Start-up will NOT proceed unless
applicable items listed in this form have
been satisfactorily completed.
TO:
TRANE SERVICE OFFICE:
S.O. NUMBER:
SERIAL NUMBERS:
JOB/PROJECT NAME:
ADDRESS:
The following items
are being installed
and will be completed by:
I I m m p p o o r r t t a a n n t t : : Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane ®
products. Contractor shall provide Trane
(or an agent of Trane specifically
authorized to perform start-up) with notice
of the scheduled start-up at least two weeks
prior to the scheduled start-up. E E q q u u i i p p m m e e n n t t
n n o o t t s s t t a a r r t t e e d d b b y y T T r r a a n n e e i i s s n n o o t t w w a a r r r r a a n n t t e e d d b b y y
T T r r a a n n e e . .
Check box if the task is complete or if the answer is
"yes".
1. A A g g i i l l i i t t y y ™ ™ C C h h i i l l l l e e r r
☐ Installation meets foundation requirements.
☐ In place and piped.
☐ Isolation pads installed.
N N o o t t e e : : Do not insulate the Agility ™ chiller or
adjacent piping prior to the chiller
commissioning by Trane service personnel.
The contractor is responsible for any foreign
material left in the unit.
2. P P i i p p i i n n g g
Chilled water piping connected to:
☐ Evaporator
☐ Air handling units
☐ Pumps
☐ Flow switch or flow proving device installed (if
not factory-provided)
Condenser piping connected to:
☐ Condenser
☐ Pumps
70
☐ Flow switch or flow proving device installed (if
not factory-provided)
☐ Cooling tower
Additional piping:
☐ Make-up water connected to cooling tower
☐ Water supply connected to filling system
☐ Does unit have freeze inhibitor? If unit has
freeze inhibitor:
☐ Verify type and concentration correct per
unit submittal
☐ Calculate and record freeze point of the
solution: ___________ (specify °F or °C)
☐ Systems filled
☐ Pumps run, air bled from system
☐ Strainers installed in entering water piping
(evaporator and condenser) and cleaned
☐ Relief valve ventilation piping installed (as
applicable)
3. F F l l o o w w b b a a l l a a n n c c i i n n g g v v a a l l v v e e s s i i n n s s t t a a l l l l e e d d
☐ Leaving chilled water
☐ Leaving condenser water
☐ Proper porting to measure flow and balance
4. G G a a u u g g e e s s , , t t h h e e r r m m o o m m e e t t e e r r s s , , a a n n d d a a i i r r v v e e n n t t s s
☐ Installed on both sides of evaporator
☐ Installed on both sides of condenser
5. W W i i r r i i n n g g
☐ Wire size per submittal and NEC 310-16
☐ Full power available
☐ External interlocks (flow switch, pumps
auxiliary, etc.)
☐ Chilled water pump (connected and tested)
☐ Condenser water pump (connected and tested)
☐ Cooling tower fan rotation checked
☐ 115 Vac power available for service tools (as
required)
☐ All controls installed and connected
☐ If unit was disassembled for installation, all
interconnecting wiring reinstalled
☐ For CVHS and CVHM chillers, indicate type of
power distribution grounding:
☐ Solidly Grounded (Center Ground Wye)