Pre-Installation Checklist; Appliance Positioning; Appliance Installation - Prolitec AirQ 1280 Original Instructions Manual

Table of Contents

Advertisement

Pre-installation Checklist

This checklist should be completed before install date.
1. Confirm the area to be targeted for air treatment.
2. Confirm the general direction of ambient air flow in the area and position the machine so that
the plume will be more evenly distributed and carried by the natural air flow.
3. Determine the number of machines required, which is the total cubic feet to be served divided
by a maximum of 150,000.
4. Based on step 2, determine the wall positions for installation, keeping in mind that the Appliance
requires 110/220V AC.

Appliance Positioning

It is important to find a location that is easily accessible for service and cartridge refills.

Appliance Installation

1. Place the appliance onto the desired location on the wall and ensure that it is level.
2. Fasten the appliance to the wall using the necessary anchors, screws and washers provided.
3. Assemble the Plume Connector
4. Assemble hose and hose connector together
approximately 1/8 of an inch clearance between the top of the cartridge hose connector and the
end of the hose. Then secure with clamp, ensuring that the hose connector is still free to rotate.
5. Connect the power cord to a junction box or connect AC plug to a nearby outlet.
AirQ 1280
(see instructions in HVAC
(see cartridge
INSTALLATION: DIffusion via Direct Indoor Fan
section)
change). Be sure to leave
10
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents