Switching Call Processing - Nortel 1000 Installation And Commissioning Manual

Table of Contents

Advertisement

Page 140 of 466
NN43041-310
Standard 01.11
Installing software on the CS 1000E
4
Test system redundancy and media devices:
LD 137
TEST RDUN
DATA RDUN
STAT FMD
STAT RMD
5
Clear the display and minor alarms on both CP PM Call Servers:
LD 135
CDSP
CMAJ
CMIN ALL
6
Check dial tone.
7
Check applications (CallPilot, Symposium, and so on)
Switch call processing
Procedure 25

Switching call processing

LD 135
SCPU
CP PM Call Server 0 is now the active call processor.
October 2008
Load program
Test redundancy
Test database integrity
Status of one or both Fixed Media Devices
(FMD)
Status of one or both Removable Media Devices
(RMD)
Load program
Clear the displays on the cores
Clear major alarms
Clear minor alarms
End of Procedure
Load program
Switch call processing from CP PM Call
Server 1 to CP PM Call Server 0
End of Procedure

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000eCommunication server 1000Communication server 1000e

Table of Contents