Installing A Dsp Daughterboard - Nortel 1000 Installation And Commissioning Manual

Table of Contents

Advertisement

Procedure 11

Installing a DSP Daughterboard

1
Place the MGC on a safe ESD surface.
2
Place the DSP DB in either DB position 1 (for DSP DB-96) or DB position
2 (for DSP DB-32), or both, depending on how the Daughterboards will be
configured from a TN perspective.
3
Ensure the DSP DB is securely attached to the MGC (using the four
supplied screws and standoffs).
Note: Note: Call Server dongles do not need to be retained for IPMGs.
Installing the MGC card
Procedure 12
Installing the MGC card
You must ensure that all dongles (for both MGC and CP PM cards) are
correctly identified.
You must destroy or return the SSC dongle to your local
Nortel Repairs/Returns center.
For the CP PM call server you must use the dongle provided with the
software kit.
To install the MGC card, perform the following steps:
1
Power down the Main Chassis.
2
Remove the SSC card.
3
Install the DSP Daughterboard on the MGC card as described in
Procedure 11 on
4
Insert the MGC into Slot 0 of the Chassis.
Installing and connecting CS 1000E hardware
End of Procedure
page
105.
Communication Server 1000E
IMPORTANT!
Installation and Commissioning
Page 105 of 466

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000eCommunication server 1000Communication server 1000e

Table of Contents