Ground Wire From Pciii - Dynojet Power Commander III Installation Instructions

2006-2007 yamaha fjr 1300
Table of Contents

Advertisement

Ground wire from PCIII

i419-411
www.powercommander.com
8
Route the ground wire to the right
hand side of the throttle bodies.
Route the ground wire under the
frame cross member and above the
radiator.
9
Attach the ground wire to the negative
side of the battery (Fig. D).
10
Install the PCIII in the tool kit tray
(Fig. E) using the supplied velcro.
Make sure to clean both surfaces with
the supplied alcohol swab before
attaching velcro.
11
Make sure all wires are routed so that
they will not get pinched.
12
Reinstall the fuel tank and seats.
Note:
It is recommended to disconnect the
stock O2 sensor to get the full poten-
tial out of the bike and the Power
Commander .
Follow the wires com-
ing out of your exhaust and discon-
nect these wires where it goes into the
main wiring harness.
2006-2007 Yamaha FJR 1300 - PCIII USB - 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Power Commander III and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents