Summary of Contents for Dynojet Power Commander III
Page 1
EFORE TARTING NSTALLATION OWNLOAD THE OWER OMMANDER SOFTWARE AND LATEST MAPS FROM OUR WEBSITE POWERCOMMANDER Dynojet Research • 2191 Mendenhall Drive • North Las Vegas, NV 89081 • (800) 992-4993 2008 Kawasaki ZX14 - PCIII USB EX - 1 i234-411EX...
Page 2
The ignition must be turned OFF before installation. Remove the left hand fairing and inner fairing. Remove the bolts that hold the coolant reserve bottle to the engine as shown in Figure A. Temporarily let the bottle hang out of the way. remove bolts Unplug the stock connector from the throttle bodies as shown in Figure B.
Page 3
Attach the connectors from the PCIII USB EX harness to the throttle bodies and stock wiring stock connector harness connectors as shown in Figure D. PCIII USB EX connectors stock connector Attach the ground wire from the PCIII USB EX ignition module PCIII USB EX to the frame using the stock upper bolt...
Need help?
Do you have a question about the Power Commander III and is the answer not in the manual?
Questions and answers