Dynojet Power Commander III Installation Manual

Dynojet Power Commander III Installation Manual

2007 yamaha yzf r1

Advertisement

Parts List

1
Power Commander
1
USB Cable
1
CD-ROM
1
Installation Guide
1
Power Adapter
2
Power Commander Decals
2
Dynojet Decals
2
Velcro
Strip
®
1
Alcohol Swab
1
Wire tap
The ignition MUST be turned
OFF before installation!
You can also download the Power
Commander software and latest maps
from our web site at:
www.powercommander.com
PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION
Dynojet Research 2191 Mendenhall Drive North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com
i426-411
www.powercommander.com
2 0 0 7 Ya m a h a Y Z F R 1
I n s ta l l a t i o n I n s t r u c t i o n s
Button Adjustment Display
Faceplate Buttons
Expansion Port
2007 Yamaha YZF R1- PCIII USB - 1
USB Port

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Power Commander III and is the answer not in the manual?

Questions and answers

Summary of Contents for Dynojet Power Commander III

  • Page 1: Parts List

    Commander software and latest maps from our web site at: www.powercommander.com PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION Dynojet Research 2191 Mendenhall Drive North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com i426-411 www.powercommander.com 2007 Yamaha YZF R1- PCIII USB - 1...
  • Page 2 Remove the main seat. PCIII harness Lift the front of the fuel tank up and use something to keep it propped up. Route the PCIII harness down the right hand side of the bike. Route the PCIII harness underneath the fuel tank bracket (Fig.
  • Page 3 Crimp the supplied wire tap to the WHITE wire of the ECU (Fig. D). This wire is from the smaller of the two ECU connectors in position 5. Note:The wire location is numbered on the back of the connector .. Connect the GREY wire from the PCIII to the wire tap (Fig.

Table of Contents