W
'
HAT
S IN THIS
G
UIDE
Quick Start
This Quick Start provides the basic steps required for getting your
SCOPIA
MCU up and running. The suggested order of
100
operation is as follows:
Preparing for Installation
1.
Introduction
2.
Unpack and Verify the Equipment
3.
Prepare a Checklist
4.
Prepare the Site
5.
Mount the SCOPIA
(Optional)
Setting Up the MCU Component
6.
Assign an IP Address to the MCU
7.
Connect to the IP Network
8.
Configure the MCU
9.
Save the Configuration
Setting Up the MVP Component
10.
Assign an IP Address to the MVP
11.
Change the Configuration Software Password
12.
Point the MVP to the Controlling MCU
13.
Save MVP Network Configuration Settings
MCU Unit in a 19" Rack
100
What's in this Guide 1