Heat & Glo SL-3X-IFT Installation Manual page 31

Hide thumbs Also See for SL-3X-IFT:
Table of Contents

Advertisement

Rear Vent - Horizontal Termination - (continued)
Three Elbows
Note: Use DVP Series
components only.
INSTALLED
HORIZONTALLY
Figure 4.22
Heat & Glo • SL-3X-IFT, SL-5X-IFT, SL-7X-IFT, SL-9X-IFT Installation Manual • 2472-980 Rev. Q • 3/20
H
Maximum
1
1-1/2 ft.
3-1/2 ft.
5-1/2 ft.
7-1/2 ft.
H
3
V
Minimum
1
Back to Back
457 mm
Elbows
1.1 m
1 ft.
305 mm
1.7 m
2 ft.
610 mm
2.3 m
3 ft.
914 mm
H
Maximum = 7-1/2 ft. (2.3 m)
1
H
+ H
+ H
Maximum =13-1/2 ft. (4.1 m)
1
2
3
V
+ H
1
1
H
2
ALL MODELS
H
+ H
2
3
1 ft.
305 mm
2 ft.
610 mm
4 ft.
1.2 m
6 ft.
1.8 m
+ H
= 40 ft. (12.2 m)
3
V
1
H
1
H
+ H
+ H
Maximum
1
2
3
2-1/2 ft.
762 mm
5-1/2 ft.
1.7 m
9-1/2 ft.
2.9 m
13-1/2 ft.
4.1 m
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-5x-iftSl-5xlp-iftSl-7x-iftSl-7xlp-iftSl-9x-ift

Table of Contents