B. Clearances to Combustibles
When selecting a location for the appliance it is important to
consider the required clearances to walls. See Figure 3.5.
WARNING! Risk of Fire or Burns! Provide adequate
clearance around air openings and for service access.
Due to high temperatures, the appliance should be lo-
cated out of traffic and away from furniture and draperies.
A
K
E
A
I
I
L
Models
in.
SL-3X-IFT
mm
in.
SL-5X-IFT
mm
in.
SL-7X-IFT
mm
in.
SL-9X-IFT
mm
Figure 3.5 Appliance Locations
Heat & Glo • SL-3X-IFT, SL-5X-IFT, SL-7X-IFT, SL-9X-IFT Installation Manual • 2472-980 Rev. Q • 3/20
C
Refer to Section 10.B for mantel and wall
projection information.
Consider the mantel or cabinet system to be
installed and comply with the necessary
requirements for elevated hearth. Refer to
instructions included with cabinet system.
NOTICE: Additional clearances are required for
systems
installations. Provisions must be made in advance to ensure
fit within the framing.
J
A
B
C
D
39-1/2
34
55-7/8
1003
864
1419
42
37
59-1/2
See Section
1067
940
1511
10.B for
Alcove
45-1/2
42
64-3/8
Installation
1156
1067
1635
50-1/2
49
71-1/2
1283
1245
1816
NOTICE: Illustrations reflect typical installations and are
FOR DESIGN PURPOSES ONLY. Illustrations/diagrams
are not drawn to scale. Actual installation may vary due to
individual design preference.
D
heat management
B
H
E
F
G
H
Min.
1/2
44
62-1/4
16-1/4
13
1118
1581
413
1/2
44
62-1/4
16-1/4
13
1118
1581
413
1/2
45-1/2
64-3/8
16-1/4
13
1156
1635
413
1/2
50-1/2
71-1/2
16-1/4
13
1283
1816
413
F
I
J
K
L
48-1/2
68-3/4
13-1/2
7-1/2
1232
1746
343
191
48-1/2
68-3/4
15-1/16
7-1/2
1232
1746
383
191
48-1/2
68-3/4
16-5/8
7-1/2
1232
1746
422
191
50-1/2
71-1/2
19-1/2
9-1/4
1283
1816
495
235
F
13

Hide quick links: