Top Vent - Vertical Termination
No Elbow
Note: Use SLP Series
components only.
Note: If installing a vertical vent/termination off the top of
the appliance, the optional vertical termination baffle may
be needed.
V
= 60 ft. Max. (18.3 m)
1
Figure 4.14
Heat & Glo • SL-3X-IFT, SL-5X-IFT, SL-7X-IFT, SL-9X-IFT Installation Manual • 2472-980 Rev. Q • 3/20
V
1
Exhaust Restrictor Instructions
Exhaust restrictors are recommended for these verti-
cally terminated products which have excessive draft.
Exhaust restrictors will compensate for high draft, and
restore visual flame height. If the vent configuration has
a total vertical of 15-60 feet, an exhaust restrictor may
be needed. The exhaust restrictor can be located in the
appliance manual bag.
Note: Remove top refractory piece, if installed.
1. Install the exhaust restrictor over the center of the ex-
haust outlet in the firebox. See Figure 4.15.
2. Center the exhaust restrictor in the open end of the
exhaust outlet and secure through the slots on the ex-
haust restrictor with the two 1/4 in. self tapping screws
provided in the appliance manual bag.
3. Reinstall top refractory.
Note: Be sure to reinstall the inner heat shield
after exhaust restrictor installation.
EXHAUST RESTRICTOR
EXHAUST RESTRICTOR
Figure 4.15 Exhaust Restrictor Installation
(Top Refractory Panel Removed to Aid in Visual Clarity)
TOP VENT APPLICATION
REAR VENT APPLICATION
25