Heat & Glo SL-3X-IFT Installation Manual page 24

Hide thumbs Also See for SL-3X-IFT:
Table of Contents

Advertisement

Top Vent - Horizontal Termination - (continued)
Three Elbows
V
Minimum
1
Elbow only**
1 ft.
1/2 ft.**
152 mm
2 ft.
1-1/2 ft.** 457 mm
3 ft.
2-1/2 ft.** 762 mm
5 ft.
3-1/2 ft.
1.1 m
7 ft.
4-1/2 ft.
1.4 m
14 ft.
V
*No specific restrictions on this value EXCEPT V
Note: Use SLP Series
components only.
WARNING **
Fire Risk.
• When using SLP-HRC-SS termination cap
on top vented fireplaces, a one foot minimum
vertical vent section is required before installing
first elbow.
Figure 4.13
24
Heat & Glo • SL-3X-IFT, SL-5X-IFT, SL-7X-IFT, SL-9X-IFT Installation Manual • 2472-980 Rev. Q • 3/20
H
Maximum
H
+ H
1
1
All Models
305 mm
2 ft.
610 mm
4 ft.
914 mm
6 ft.
1.5 m
10 ft.
2.1 m
14 ft.
4.3 m
14 ft.
+ H
+ V
+ H
Maximum = 40 ft. (12.2 m)
1
1
2
2
+ V
1
(12.2 m)
** See warning below
H
2
Maximum
V
V
+ V
2
2
1
*
610 mm
*
1.2 m
*
1.8 m
*
3.0 m
*
4.3 m
*
4.3 m
*
+ H
+ H
CANNOT exceed 40 ft.
2
1
2
V
2
Minimum
2
*
*
*
*
*
*
*
Note: There MUST be a 25%
reduction in total H when
using flex vent except when
using the simple up and out
installation. See Figure 4.9.
H
1
V
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-5x-iftSl-5xlp-iftSl-7x-iftSl-7xlp-iftSl-9x-ift

Table of Contents