Belt Installation; Operation; Drill/Chuck Installation - Dake TB-16V Instructional Manual

Table of Contents

Advertisement

BELT INSTALLATION

WARNING: Do not change the distance between the spindle pulley and motor pulley. And
lockout the machine before changing the belt.
1. Turn the variable speed handwheel clockwise direction to open the groove of the spindle
pulley.
2. Put the belt on the pulley from spindle pulley to motor pulley.
3. Turn the motor pully handle to tension the belt.
4. Close pulley cover before proceeding to operate machine.

OPERATION

DRILL/CHUCK INSTALLATION

1. Before inserting drill bits, chucks, or arbors always clean out the spindle hole and taper
hole with a clean cloth.
2. Open chuck jaws completely by turning attached chuck key counter-clockwise until the
jaws are fully opened.
3. To install the chuck to the arbor tightly, slide the chuck into the taper forcing it into the
spindle with by handle.
4. Place a block of wood on the table then lower the spindle to contact the wood and press
the chuck tightly into the spindle taper.
5. Install a taper shaft drill into the taper the same way as you would the chuck. If an
adaptor is used it must fit the taper correctly and the bit must fit snug in the adaptor.
977102-1
10
Dake Corporation
724 Robbins Road
Grand Haven, MI 49417
www.dakecorp.com
REV112019

Advertisement

Table of Contents
loading

Table of Contents