Package Checklist - Paradyne FrameSaver SLV Series Installation Instructions Manual

1-slot unit
Table of Contents

Advertisement

-
An async (asynchronous) terminal or PC (personal computer) and an EIA-232
cable to connect to and set up the FrameSaver unit.
-
Node IP Addresses and Subnet Masks. See your network administrator for this
information.
-
IP Addresses and Subnet Masks of trap manager(s).
-
Connection to the telephone network for the modem.
-
If a DBM is installed,
— ISDN service and ISDN switch type
— CNIS (calling number identification service) of the answering unit.
— Phone numbers for the calling and answering ISDN DBMs.
— If a BRI DBM, the SPID (service profile identification)
— Local phone number for the unit.
NOTE:
It is important that you follow the instructions for installing the FrameSaver unit as
they are presented if you are to have a quick and trouble-free installation. Do not
install your cables until instructed to do so.

Package Checklist

Verify that your package contains the following:
-
1-Slot FrameSaver SLV (service level verifier) unit
-
Power cord with desktop power transformer.
— 120 Vac power transformer for a FrameSaver 9124, 9624, or 9128.
— 100 – 240 Vac power transformer for a FrameSaver 9126.
-
Modular cable for U.S. network access:
— RJ48C (T1) if a FrameSaver 9124, 9126, or 9128 (20 feet – 6.1 meters)
— RJ48S (DDS) if a FrameSaver 9624
-
DSX adapter if a FrameSaver 9126 (1 foot – 0.3048 meters)
-
Modular RJ11C cable for the modem connection of a FrameSaver 9126 or 9128
(14 feet – 4.27 meters)
2

Advertisement

Table of Contents
loading

Table of Contents