Safety Instructions; Package Checklist - Paradyne FrameSaver SLV 9x24 Series Installation Instructions Manual

1-slot unit
Table of Contents

Advertisement

-
Node IP Addresses and Subnet Masks. See your network administrator for this
information.
-
The DLCI (data link connection identifier) for each end of the PVC (permanent
virtual circuit), provided when the frame relay service was purchased.
-
T1 time slot assignments, if a FrameSaver SLV 9124 unit.
NOTE:
It is important that you follow the instructions for installing the FrameSaver unit as
they are presented if you are to have a quick and trouble-free installation. Do not
install your cables until instructed to do so.

Safety Instructions

Please refer to the EMI Warnings and Important Safety Instructions beginning on
page 24.

Package Checklist

Verify that your package contains the following:
-
1-Slot FrameSaver SLV unit
-
Power cord with desktop 120 Vac power transformer
-
Modular cable for U.S. network access:
— RJ48C (T1) if a FrameSaver 9124 (20i – 6.1m)
— RJ48S (DDS) if a FrameSaver 9624 (14i – 4.3 m)
-
FrameSaver SLV 9x24 Quick Reference (Document No. 9024-A2-GL10)
Additional cables may need to be ordered. See Cables You May Need to Order on
page 3 when ordering cables.
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Framesaver slv 9124Framesaver slv 9624

Table of Contents