Install The Power Cord At The Control - Remote - Kallista P50047-G5 Installation Instructions Manual

60" x 32" acrylic air bath
Hide thumbs Also See for P50047-G5:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
 Install a standard NPT threaded strain relief to the blower motor cover.
 Temporarily store the removed components in a safe location.
Connect the New Power Cable at the Blower Motor
 At the blower motor 4" (102 mm) pigtail lead, strip back the cable jacket about 3" (76 mm).
 Cut the unused brown conductor off at the cable jacket and cap off with a wire nut.
 At the newly installed blower motor power cable, strip back the cable jacket about 2" (51 mm).
 For installations in the United States, mark white conductors with red or black tape as required by the NEC.
 Strip the wire insulation about 3/8" (10 mm) from the blower motor pigtail leads and the power cable leads.
 Route the new power cable leads through the blower motor access cover and strain relief.
 Using wire nuts or other approved termination devices, terminate the conductors as follows:
● Connect the black pigtail lead to the L1 conductor of the power cable.
● Connect the blue pigtail lead to the L2 conductor of the power cable.
● Connect the green with yellow stripe pigtail lead to the grounding/earthing conductor of the power cable.
 With the two screws, reinstall the access cover on the blower motor.
 Tighten the strain relief on the power cable at the blower motor.
 Remove any dust or debris from the blower motor area.
Second Junction Box
(Not Provided)
Blower
Adapter
Board
New Field
Cable To
Blower Motor
Install the Junction Box on the Control
 Install a second junction box with external bonding lug, two strain reliefs, and a cover (not supplied) on the
blower adapter board on the control.
1107630-2-C
17 of 28
CONNECT THE CABLE AT THE BLOWER - REMOTE (CONT.)

11. INSTALL THE POWER CORD AT THE CONTROL - REMOTE

Wire Connectors
Field Cable to
Blower Motor
60 Hz
L1
L2
Blower
GND GND
Motor Pigtail
NC
60" x 32" Acrylic Air Bath
Blue
50 Hz
From Control
L1
Black
N
Blue
Green w/Yellow Stripe
NC
Brown
Questions? Problems? For additional assistance, please contact KALLISTA's Customer
Service Department at 1-888-4-KALLISTA (1-888-452-5547) or kallista.com.
Ground
(Green with Yellow Stripe)
Brown
From Control
Black
Strip back the jackets
about 3" (76 mm) on
the field cable and on
the blower motor power
cord. Cut the brown
wire at the cable jacket.

Advertisement

Table of Contents
loading

Table of Contents