4.5.4 (Optional) Installing the 24 V Power Module

Step 1 Remove the mounting bracket of the 24 V power module from the cabinet.
Step 2 Install the 24 V power module in the mounting bracket.
Step 3 Secure the 24 V power module to the mounting bracket using the screws (delivered with the
24 V power module).
Step 4 Install the 24 V power module in the cabinet.
Step 5 Connect the AC input power cable (delivered with the SACU) to the 24 V power module
based on the cable label.
Figure 4-15 Installing a 24 V power module
----End

4.5.5 Installing the PoE Module

Step 1 Loosen screws (do not remove the screws) and remove the mounting board.
Step 2 Remove screws from the PoE module installation position.
Step 3 Place the PoE module at the installation position and align the mounting holes. Then secure
the PoE module.
Step 4 Secure the mounting board.
Issue 01 (2020-02-14)
Indicators should be in the lower left corner.