SmartACU2000D Smart Array Controller
User Manual (with No PID Module)
Figure 7-7 Removing a faulty SmartLogger
Step 3 Remove the mounting ears and guide rail–mounting kit from a new SmartLogger, and install
the cabinet-mounting kit.
Figure 7-8 Replacing a SmartLogger
Step 4 Install the new SmartLogger in the cabinet.
Step 5 Connect the cables based on their labels.
Issue 01 (2020-02-14)
Copyright © Huawei Technologies Co., Ltd.
7 System Maintenance
78