Installing a Switch
3
4
Installing the Switch on a Table or Shelf
Procedure
Step 1
To install the switch on a table or shelf, locate the adhesive strip with the rubber feet in the mounting-kit
envelope.
Step 2
Attach the four rubber feet to the four circular etches on the bottom of the chassis.
Step 3
Place the switch on the table or shelf near an AC power source.
Step 4
When you complete the switch installation, see
configuration.
After Switch Installation
• Configure the switch. For more information, see "Setting up the Switch" topic.
• Connect to the stack ports.
• Install the power cord retainer (optional).
• Connect to the front-panel ports.
Connecting the StackWise Cables
Before connecting the StackWise cables, review the
a Cisco-approved StackWise cable to connect the switches.
Connecting a StackWise-320 Cable
Procedure
Step 1
Remove the dust covers from the StackWise cables and store them for future use.
A StackWise adapter must be installed in the StackWise port to enable stacking. In a default setup, the
StackWise adapter blanks are installed in the StackWise ports. If StackWise is ordered with the switch,
StackWise adapters are already installed in the StackWise ports, and you can proceed to step 4.
Front-mounting position
Number-12 or number-10 Phillips machine
screws
Cisco Catalyst 9300 Series Switches Hardware Installation Guide
Installing the Switch on a Table or Shelf
7
Four-point mounting position
-
-
After Switch Installation, on page
Planning a Switch Data Stack, on page
43for information on switch
30. Always use