Tools And Equipment; Verifying Switch Operation - Cisco Catalyst 9300 Series Hardware Installation Manual

Hide thumbs Also See for Catalyst 9300 Series:
Table of Contents

Advertisement

Installing a Switch
3
4
5
6
7
8
Note
1. The item is orderable.

Tools and Equipment

Obtain these necessary tools:
• A Number-2 Phillips screwdriver.

Verifying Switch Operation

Before you install the switch in a rack, on a wall, or on a table or shelf, power on the switch and verify that
it passes POST.
To power on the switch, plug one end of the AC power cord into the switch AC power connector, and plug
the other end into an AC power outlet.
As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the switch
functions properly. LEDs can blink during the test. The SYST LED blinks green, and the other LEDs remain
solid green.
When the switch completes POST successfully, the SYST LED remains green. The other LEDs turn off and
then reflect the switch operating status. If a switch fails POST, the SYST LED turns amber.
POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.
After a successful POST, unplug the power cord from the switch and install the switch in a rack, on a wall,
on a table, or on a shelf.
Warning
Attach only the following Cisco external power system to the switch: Cisco XPS 2200 Statement 387
Product documentation and compliance
document
Four rubber mounting feet
Ground lug screw and ring terminal
Two 19-inch mounting brackets
Four number-12 pan-head screws
Four number-10 pan-head screws
Cisco Catalyst 9300 Series Switches Hardware Installation Guide
11
M4.0 x 20mm Phillips pan-head screw
12
(Optional) RJ-45 console cable
13
(Optional) USB console cable
14
(Optional) StackWise-480 cable
(0.5-meter, 1-meter, or 3-meter)
15
(Optional) StackPower cable (0.3-meter
1
or 1.5-meter)
16
(Optional) StackWise-320 cable
Tools and Equipment
1
1
1
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents