Tools And Equipment; Verifying Switch Operation - Cisco Catalyst C9200L-48PXG-4X-E Hardware Installation Manual

C9200-l c9200l-48pxg-4x-e o cerc
Table of Contents

Advertisement

Tools and Equipment

Figure 8: Components delivered in the shipping box
1
2
3
4
5
6
7
1. Item is orderable.
Tools and Equipment
Obtain these necessary tools:
• A Number-2 Phillips screwdriver.

Verifying Switch Operation

Before you install the switch in a rack or on a table or shelf, power on the switch and verify that it passes
POST.
To power on the switch, plug one end of the AC power cord into the switch AC power connector, and plug
the other end into an AC power outlet.
Cisco Catalyst 9200 Series Switches Hardware Installation Guide
18
Cisco Catalyst 9200 Series switch
supply modules are not displayed)
AC power cord
Four rubber mounting feet
Two 19-inch mounting brackets
4 number-12 pan-head screw
4 number-10 pan-head screws
8 number-8 Phillips flat-head screws
1
(power
8
Cable guide
9
M4.0 x 20mm Phillips pan-head screw
10
RJ-45 USB console cable
11
(Optional) USB console cable
12
(Optional) StackWise cable
1-meter, or 3-meter)
13
Power cord retainer
-
-
Installing the Switch
1
1
1
(0.5-meter,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents