Setup; Environmental Requirements; Space And Airflow Requirements - Huawei TaiShan 2280 V2 User Manual

Table of Contents

Advertisement

TaiShan 2280 V2 Server
User Guide

4.1 Environmental Requirements

4.2 Unpacking the Chassis
4.3 Installing Optional Parts
4.4 Installing the Server on Guide Rails
4.5 Connecting External Cables
4.6 Initial Configuration
4.1 Environmental Requirements

4.1.1 Space and Airflow Requirements

To allow for servicing and adequate airflow, observe the following space and airflow
requirements:
l
l
l
l
l
The server draws in cool air from the front of the cabinet and exhausts hot air from the rear.
Therefore, the front and rear of the cabinet must be well ventilated for optimal heat
dissipation.
Issue 01 (2019-07-01)
NOTE
l For details about the safety precautions to be observed when you install or replace servers and their
parts, see the
Server Safety
l Suitable for mounting on concrete or other non-combustible surface only.
Install the server in an access-restricted area.
Keep the area in which the server is located clean and tidy.
To facilitate heat dissipation and maintenance, keep a clearance of 800 mm (31.50 in.)
between walls and the front and rear doors of the cabinet.
Do not block the air intake vents. Otherwise, air intaking and heat dissipation will be
affected.
The air conditioning system in the equipment room provides enough wind to ensure
proper heat dissipation of all components.
Figure 4-1
shows the direction of heat dissipation.
Copyright © Huawei Technologies Co., Ltd.
Information.

4 Setup

4
Setup
54

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents