Inspecting For Damage - Avaya Scopia Installation Manual

Application server
Hide thumbs Also See for Scopia:
Table of Contents

Advertisement

3. Cut the plastic straps.
4. Cut the strapping tape.
5. Open the shipping box.
6. Take the accessories kit out of the shipping box.
7. Take the device out of the shipping box.
8. Carefully open the additional boxes, remove the packing material, and remove the drives and
9. Remove the cellophane wrapping from the server case.
10. After opening the shipping box, check the shipment is complete. Compare the contents of the

Inspecting for Damage

After you verify that all of the equipment is included, carefully examine the power supplies and cables for
any damage resulting from shipping. If you suspect any damage from shipping, contact your local freight
carrier for procedures on damage claims. If you observe any physical defects in the items you ordered,
contact Technical Support for Return Material Authorization (RMA) form.
Installation Guide for Avaya Scopia
Caution:
The accessories kit is situated on top of the device inside the shipping box and can be
damaged if the box is placed upside down. Pay attention to the This Side Up symbol on
the shipping box to handle the box correctly at all times.
Caution:
To prevent injury and equipment damage, follow the lifting guidelines described in the
Safety Guide when lifting or moving the shipping box.
Caution:
The plastic straps are tightly stretched and can hit you when you cut them. To avoid this,
make sure you do not face the side of the box secured by the straps before you cut the
straps.
other contents.
Important:
We recommend keeping the packaging materials in case you need to repack the device.
shipment with the packing list included in the box.
®
Application Server Version 2
Figure 1: This Side Up symbol
Preparing the Avaya Scopia
®
Application server Setup | 7

Advertisement

Table of Contents
loading

Table of Contents