Maintenance - LEAB LPS Series User Manual

Lithium power supply
Table of Contents

Advertisement

Installation instructions
General
Battery Status
Operation Status
Remaining Operation
Current Capacity
Power
Voltage
Current
Temperature
Cell 1, 2, 3, 4
Number of Cycles
Temperature
Transformer Temperature
IGBT Module
Between Cell 1 and 2
Between Cell 2 and 3
Between Cell 3 and 4
Error Codes
About
Serial Number
Manufactured
Hardware Version
Software Version - Unit
Software Version - Display

14 Maintenance

Regular Inspection
Check the LPS as follows each time before using it:
Check the mains cable and mains plug for damage.
Check charging cables and connections for damage. The LPS must not
come into contact with water, oil or other liquids.
Check the LPS for external damage.
Check the trip test for the RCD fuse.
Charge the battery at intervals of 3 months via a 230-V mains supply for at
least 6 hours.
Page 21 of 25
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for LEAB LPS Series

This manual is also suitable for:

Lps 1212Lps 2512Lps 1512

Table of Contents