Installing The Connection Set / Preparing Connections - LEAB LPS Series User Manual

Lithium power supply
Table of Contents

Advertisement

Installation instructions
8

Installing the Connection Set / Preparing Connections

Anderson Plug
To mount the Anderson plug, observe the following notes:
For installation you need a H07V-K or equivalent electrical
cable with a cross-section of 16 mm² and a crimping tool.
Grey Anderson plug for DC input (12 V).
Red Anderson plug for DC output (12 V).
Notice: Reverse polarity may damage the device. Pay attention to the
polarity of the wires. The housing is marked with plus and minus.
Loosen and pull out incorrectly inserted cores using gentle lever
movements from a screwdriver (slot).
Mounting Neutrik Plug
To mount the Neutrik plug, observe the following notes:
For installation you need a H07RN-F 3G or equivalent
electrical cable with a cross-section of 1.5 mm².
blue Neutrik plug for AC input (230 V)
grey Neutrik plug for AC output (230 V)
white strain relief for cables with an average cross-section of
6 mm ... 11 mm
black strain relief for cables with an average cross-section of
9.5 mm ... 15 mm
Installing the Connection Set / Preparing Connections
Page 9 of 25

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for LEAB LPS Series

This manual is also suitable for:

Lps 1212Lps 2512Lps 1512

Table of Contents