Operation - LEAB LPS Series User Manual

Lithium power supply
Table of Contents

Advertisement

Installation instructions
6.
Use a cable to connect the other screw terminal of the CDR to the positive
contact of the red Anderson plug.
7.
Connect the ground wire (black) and bridging wire (blue) of the CDR to
pin 6 of the D-Sub data adapter.
8.
Insert the D-Sub data adapter into the D-Sub plug of the LPS.
9.
Insert the grey Anderson plug into the DC input (12 V) and screw the
Anderson plug tight.
10. Insert the red Anderson plug into the DC output (12 V) and screw the
Anderson plug tight.
The CDR is connected.
Connecting the LPS Remote Display
If the LPS is installed such that the display is not visible, an LPS remote display
from LEAB can be connected to control the LPS.
To install the remote display, follow the notes and instructions in
the manual.

12 Operation

Switching on the LPS
To switch on the LPS, perform the following step:
1.
Press the On/Off button to switch on the LPS.
The display will light up.
The LPS is switched on.
Charging the LPS (230 V, AC)
To charge the LPS with 230 V, perform the following steps:
 Blue Neutrik plug is mounted.
1.
Plug the two-pin earthed plug of the mains cable into a 230-V mains
supply.
The charging process starts automatically.
Display is activated.
The factory-set mains priority circuit supplies the connected 230-V
consumers via the 230-V mains.
The LPS is charged.
Page 15 of 25
Operation

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for LEAB LPS Series

This manual is also suitable for:

Lps 1212Lps 2512Lps 1512

Table of Contents