Installation Of Accessories - LEAB LPS Series User Manual

Lithium power supply
Table of Contents

Advertisement

Installation instructions

11 Installation of Accessories

Connecting Solar Panel
To charge the LPS with solar panels, perform the following steps:
You need a solar charge controller with Maximum Power
Point Tracking (MPPT) and an output voltage (DC) of 14.5 V ...
15 V.
You have mounted the red Anderson plug.
1.
Connect the solar controller with the red Anderson plug.
2.
Connect the solar charge controller to the photovoltaic cells.
For the installation of the solar charge controller, follow the notes
and instructions in the device manual.
3.
Insert the red Anderson plug into the DC output (12 V).
4.
Activate the DC output (12 V) via the menu of the LPS (see page 18).
The solar panel is connected.
Connecting Fuel Cells
To charge the LPS using alternative charging sources (fuel cells), perform the
following steps:
You have mounted the red Anderson plug.
1.
Connect the fuel cell with the red Anderson plug.
For the installation of the fuel cell, follow the notes and instructions
in the device manual.
2.
Insert the red Anderson plug into the DC output (12 V).
3.
Activate the DC output (12 V) via the menu of the LPS (see page 18).
The fuel cell is connected.
Page 13 of 25
Installation of Accessories

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for LEAB LPS Series

This manual is also suitable for:

Lps 1212Lps 2512Lps 1512

Table of Contents